The Utah Department of Transportation is slated to install a traffic signal at the intersection of Eagle Mountain Boulevard and SR-73 in early 2025.
Following a traffic signal warrant study, UDOT determined that the intersection meets more than three of the seven criteria necessary for a signal light to be installed. Changes to this intersection are designed to improve turn movements for greater traffic safety in the area.
The design process will soon be underway, with installation slated for early next year. Typical costs for traffic signal installation are about $300,000, which will be paid for by UDOT. Infrastructure and curbing adjustments may accompany the installation to ensure the smooth integration of the new traffic signal.